Brecon High School

Hydrock is providing the Building Performance Engineering design for Powys County Council to deliver a new school building at Brecon High School, fit to meet the demands of education in the 21st century.

Brecon High School artists impression.jpg

Hydrock’s Building Performance Engineering team has delivered design services for Powys County Council for a new £22m secondary school and sixth form centre in Brecon. 

The project – part of the Welsh Government’s 21st Century Schools and Education Programme - will see the existing secondary school replaced with new school buildings fit to meet the demands of modern education. The 7,500m2 school will cater for 750 students from age 11-18, including full cooking facilities, dining areas, a four-court sports hall and activity studio. 

Working with BAM Construction, Hydrock was appointed to provide mechanical and electrical engineering design, as well as fire and acoustic advice as part of the SEWSCAP contractors framework project in Wales. 

Located within Brecon Beacons National Park - one of only four National Parks in the UK with International Dark Sky Reserve status – the area has an outstanding quality of night sky, with residents and visitors encouraged to prevent light pollution. Consequently, as part of the detailed design of the school, further modelling was used to provide a sympathetic lighting scheme and ensure minimal light pollution from the development. This included low level bollards to reduce light spill, and the use of modern street lighting columns with zero up light.
The building has been designed to meet the requirements of BREEAM Excellent. This provided an opportunity for the design team to collaborate with the Severn Wye Energy Agency, a local charity that aims to provide practical expertise for more energy efficient and sustainable living.

Hydrock, together with the Severn Wye Energy Agency, BAM and the architect, Scott Brownrigg, engaged with the school to work with a group of students tasked with investigating aspects of energy efficiency in their current school facility, including air conditioning usage, lighting and energy consumption. The students presented their findings to the project team, providing suggestions and aspirations for the new school building. 

In response, the project team presented the designs to demonstrate how the new school will perform better. This included complex thermal modelling to reduce carbon footprint by removing the need for mechanical air conditioning, instead opting for a passive, natural ventilation strategy. High efficiency equipment, LED lighting and PV roof panels also contributed to the overall low carbon design.

The project is due to open its doors to students in Autumn 2019. 

For over 20 years Hydrock has delivered award-winning engineering projects across a wide variety of sectors. Contact us today to find out how we can help your business.